Blog

Primal Gym

Clarence Dock, Leeds

Full electrical installation including new design and suspended LED panel

St. James Church

Heckmondwike

Bespoke LED lighting and complete electrical installation

Dutton Farm

York

New Build Eco smart home with ground source heating, LED lighting supplied by Gamma illumination and incorporating latest mobile app Rako controls.

Westex Carpets

This was the first lighting installation in the UK as part of the Thorn Energy Partnership. Fully Wired were commissioned to design and install a new energy efficient lighting scheme in key areas at their main production and storage site in Cleckheaton.

Westex Carpets manufactures the finest quality wool carpets from its West Yorkshire factory, but was still using traditional incandescent lighting which aside from being hugely inefficient was not powerful enough to light the stock. We installed the very latest eco lighting with motion sensors so that the factory space is only lit when needed. Here is the full specification with before and after information:

• Luminaires installed: Hi-Rack and PopPack
• Total area covered: 10,702m2
• Total energy saving: 25.3%
• Total carbon emission saving: 62.5 tonnes per annum
• Total financial saving: £17,300 per annum
• Lighting level before: <100 lux (est)
• Lighting level after: 250-300 lux
• Former LENI: 63
• Actual LENI: 47

Nostell Priory

Fully Wired were successful in the tender for the Nostell Estate Walled garden project.
This included the full scope of electrical work:

• Sub-main containment and cable distribution
• Metering installation
• Lighting and emergency lighting
• Small power in dado trunking
• Data installation
• Fire alarm
• Intruder alarm
• Car park lighting

Master Cars

Fully Wired won the contract for the electrical installation of Master Cars new state of the art premises.
Our electrical work included:

• Sub-main containment and cable distribution
• Office lighting and small power
• Workshop lighting and emergency lighting
• External lighting
• Data installation
• Fire alarm

The Pavilions

Fully Wired were successful in the tender for the Pavilions residential project.
This included the full scope of electrical work:

• Designer lighting with Rako controls
• Brushed screwless sockets and accessories
• A/V installation including cinema surround sound and ceiling speakers throughout with iPhone control
• Data installation
• Intruder alarm
• External lighting

Martech

Fully Wired completed the internal and external electrical installation at the new Martech Warehouse in Dewsbury .
This included the full scope of electrical work:

• Internal and External Lighting
• Electrical Wiring and Components
• Data installation
• Fire alarm
• Intruder alarm

Electrical Inspection and Testing

• Condition reports
• Fire alarm testing
• Emergency lighting testing
• Electrical installation testing
• Fault finding
• Latest Amtech software

Structured Cabling

• Voice and data distribution
• Audio and video distribution systems
• Intruder alarm systems